D0 at Fermilab

 

 

Silicon Microstrip Detector (SMT)

Layer 0 (Pictures)

Installation in SMT

Transport to D0 (Pictures)

Going through ECN (Pictures)

Insertion of Long Installation Tool (Pictures)

Inserting L0 (Pictures)